Hippodrome PARISLONGCHAMP

How to respond to strong architectural constraints both aesthetically and technically within a short lead time ?

In connection with the architect, we developed the design and engineering studies in order to define and validate the technical constraints of the site.

We adapted our working methods in order to integrate ourselves in the tight schedule with the other trades.

By choosing an ULTEEM steel partition with fire zones in some of the buildings, we could meet the regulatory expectations of public building.